+86-18059207777
All Categories

Company News

Home >  News >  Company News

Middle line shooting

Time : 2024-11-29

In the star power production workshop, the face of 1480 ℃ hot iron heat wave, splashing around the red welding flowers, blinding welding arc light, the workers were subjected to the temperature and welding temperature of the double “baking test”, but they did not retreat, still riveted enough energy, maintain the passion to fight, despite the sweat, “full armor” to carry out operations to ensure that each process is completed in high quality. “Fully armed” to carry out operations to ensure that each process, each product is completed with high quality. In the casting workshop of Star Power Technology Co., Ltd, two workers are pouring the cylinder block

2铁水拔渣.jpg

In the production workshop of Starlight Power Casting Co., Ltd, melting workers are carrying out iron slag pulling operation.

3油底壳焊接.jpg

In the Star Power Technology Co., Ltd. casting production workshop, welding workers in the oil sump welding operations

4发动机车间产线工作.jpg

On the production line of National Six engine and marine electric high-horsepower engine, assembly workers are assembling the engine nervously. They always stick to the front line of the post, with the high temperature, and time race, full throttle production, scrambling to grab orders, go all out to ensure that on time, according to quality, according to quantity to complete the annual production and business objectives. In the national six engine production workshop, workers work on the production line

5发动机装配.jpg

In the marine engine production line of Star Power Marine Power Co., Ltd, a worker is nervously assembling the engine In the high-temperature calibration of the “baking” road, the engineers are striving to be the best engineers.

On the road of high-temperature calibration, Xingyao Power calibration engineers are striving to be the “hot value bearer”. In order to create high-quality products with the best performance, they bravely embarked on the journey of surpassing the high-temperature limit and challenging the new height of the National VI II products, and broke through the “summer” bondage with the spirit of unremitting struggle just to create ace power to meet the needs of customers.

6工程师数据采集.jpg

In Turpan, Xinjiang, where the outdoor surface temperature exceeded 70℃ during the daytime, the calibration engineers of StarElite Power were carefully analyzing the collected test data. The high temperature was not enough to overcome the enthusiasm of the StarElite Power builders who would not stop until they reached the target. They took the high temperature as a “sharpening stone” and the hot summer as a high ground for training, and increased rather than reduced the vigor of production and construction, and gathered the power of common advancement amidst a thousand hammers, to do everything possible and die for the successful achievement of the target of the scale-doubling project of Star Power and the strategic goal of “1235”. We will do everything we can to reach the goal of scale-multiplication project and “1235” strategic goal.